You have made the necessary settings in customizing under production shop floor control integration process integration process messages.
Sap pp shop floor control configurations.
When the system chooses a routing recipe it pulls in routings recipes for the production order header material which is valid from the order start to order finish date and whose lot sizes matches with the production order quantity.
The main tool for carrying out production is the production order.
It is structure in the form of howto do configurations method.
When you do the sap configuration sequence is not really important as long as all the pp shop floor.
Shop floor control converts the planning data in material requirements planning into actual production orders and coordinates the production process with all the resources involved.
The objective of this paper is to provide the sap pp consultant with a step by step guides at configuring the sap pp shop floor control module.
It connects subsystems to download operations from production orders and upload time tickets and time events.
You have copied the standard messages for pp and pi under production shop floor control integration process integration standard settings adopt predefined message categories.
Sap pp shop floor control configurations pp questions what is sap pp module sap pp questionnaire sap pp certification questions and answers requirement gathering user requirement mapping on sap production.
Pp pdc is an interface for shop floor control in sap erp or sap s 4hana.
A step by step guide to the sap pp shop floor control configurations the sap production shop floor control system allows you defines which material is to be processed at which location at what time and how much work is required.
Normally for sap pp you can choose the standard 01 selection id and for sap pppi you can choose the 02 selection id or create your own.