You ve probably seen this resilient flooring in health clubs and gyms.
Sheetrock on basement floor.
Then remove the tape.
Tape a one foot by one foot square of plastic sheeting plastic kitchen wrap will do to the concrete wall in your basement with duct tape and leave it in place for 24 hours.
For tiles and 1 5 sq.
A common question people have when finishing a basement is should i use visqueen or plastic sheeting on one side or the other of the framed basement walls the answer is no.
How to apply drywall mud read through simple step by step instructions that show how to mix and apply both ready mix and powdered drywall compounds.
To start hanging sheetrock pick a starting point and work your way along the wall.
It exists due to the way that a home s foundation is poured.
For square or rectangular pieces of drywall use a tape measure for a straight edge.
Because a basement is prone to moisture problems consider installing steel floor joists and cross bridging and cover with board sheathing for a total of 4 08 sf.
This joint where your basement wall and floor meet is known as a cove joint.
Measure the dimensions and mark them for basement drywall installation.
When putting on the wall boards how much if any gap should there be between the concrete floor and the bottom of the board.
We have a dry basement with a concrete floor.
Some parts of the ceiling in basement might need small pieces of drywall or sheet rock.
Plastic will prevent moisture from moving through the wall.
Yes you can but it is not always easy to do.
Hang wallboard so that the 8 foot side runs horizontally and start from the top down.
This helps to point out the line.
If you want a tile floor that isn t cold underfoot put down a basement subfloor before you install your tile.
As we mentioned earlier the basement is naturally humid because of its lower location.
For sheet rubber in rolls.
The best flooring for a basement is vinyl or laminate which should be installed as a floating floor to allow for changes in the concrete caused by moisture and temperature.
As well the floor joists are often not perfectly on the same plane with one or more of the floor joists being slightly lower or higher than the others that is why so many people put 1x3 or even 1x4 strapping on the ceiling.
The boards are 3 8 inch i was thinking about using a.
Learn how to eliminate common basement leaks and prevent them from reoccurring without wasting money or time.
Mark the location of studs they should be 16 inches apart.
This helps keep them properly aligned.
The joists may not be perfectly spaced and you only have a 1 1 2 inch target for attaching two edges of the drywall.